Advertisement
100% x 90
Fence Material Calculator

Fence Material Calculator

Calculate fence materials needed including posts, rails, pickets, and concrete volume

Calculate Fence Materials

Fence Dimensions

Typically 6-8 ft (2-3 m)

Rails Configuration

Typically 2-3 rails per section

Picket Configuration

Common: 3.5", 5.5" (9, 14 cm)

Typically 2.5" (6.4 cm)

Post Footing (Concrete Calculation)

Common post sizes: 4x4" (10x10 cm), 6x6" (15x15 cm)

Fence Material Requirements

0
Posts Needed
Length: 0.0 m
0
Fence Sections
0
Rails Needed
Total length: 0.0 m
0
Pickets Needed
Total length: 0.0 m
0.000 m³
Concrete Volume
For post footing

Calculation Formulas:

  • • Posts = (Fence Length ÷ Post Spacing) + 1
  • • Post Length = Fence Height × 1.5 (1/3 buried underground)
  • • Rails = Rails per Section × Number of Sections
  • • Pickets = Fence Length ÷ (Picket Width + Picket Spacing)
  • • Concrete hole = 3× post dimension, depth = ½ fence height
  • • Recommended: Buy 10% extra materials for waste and adjustments

Material Analysis

Example Calculation

100 ft Privacy Fence Example

Fence Length: 100 feet

Post Spacing: 8 feet

Fence Height: 6 feet

Picket Width: 5.5 inches

Picket Spacing: 2.5 inches

Rails per Section: 2

Material Requirements

Posts needed: (100 ÷ 8) + 1 = 13.5 → 14 posts

Post length: 6 × 1.5 = 9 feet each

Sections: 14 - 1 = 13 sections

Rails: 13 × 2 = 26 rails

Pickets: 100 ÷ (5.5" + 2.5") = 100 ÷ 8" = 150 pickets

This matches the competitor's FAQ example!

Advertisement
100% x 250

Fence Material Types

W

Wood Fencing

Cedar, pine, redwood

Natural look, requires maintenance

V

Vinyl Fencing

PVC material

Low maintenance, weather resistant

M

Metal Fencing

Aluminum, steel, iron

Durable, security-focused

C

Composite

Wood-plastic blend

Low maintenance, eco-friendly

Planning Tips

Buy 10% extra materials for waste and future repairs

Check local building codes for height restrictions

Mark utility lines before digging post holes

Consider gate placement in your calculations

Account for ground slope and grade changes

Understanding Fence Material Calculations

Essential Components

Fence construction requires careful calculation of all materials to ensure structural integrity and proper coverage. Each component serves a specific purpose in the fence system.

Material Requirements

  • Posts: Provide vertical structure and stability
  • Rails: Horizontal framework connecting posts
  • Pickets: Vertical boards providing privacy/decoration
  • Concrete: Secures posts in ground

Calculation Formulas

Posts: ⌈(Fence Length ÷ Post Spacing) + 1⌉

Sections: Number of Posts - 1

Post Length: Fence Height × 1.5

Rails: Sections × Rails per Section

Pickets: ⌈Fence Length ÷ (Picket Width + Spacing)⌉

Note: ⌈⌉ indicates rounding up to the nearest integer, as you cannot buy partial posts or pickets.

Professional Recommendations

  • • Standard post spacing: 6-8 feet (2-3 meters) for most residential fences
  • • Post burial depth: Minimum 1/3 of total post length underground
  • • Material waste factor: Order 10-15% extra materials for cuts and adjustments
  • • Concrete curing: Allow 24-48 hours before attaching rails and pickets
  • • Building codes: Check local regulations for height limits and setback requirements
Advertisement
100% x 250